-
-
Description: Tom Shane came July 30 to install wiring above the ceiling and these new spot lights.
-
-
Description: Riehle Decorating arrived August 18 to fix holes and prepare the entire surface.
-
-
Description: On August 19, Riehle returned to prime all the prepared surfaces.
-
-
Description: Wall sections located above dentil moldings were also resurfaced.
-
-
Description: On August 25, Riehle returned to apply the ‘glass’ mesh.
-
-
Description: ‘Glass’ is sealed by spraying a liquid adhesive that penetrates the mesh.
-
-
Description: Liquid adhesive is then rolled to completely seal ‘glass’ mesh to ceiling.
-
-
Description: Wet surfaces take several days to dry completely before painting.
Total pictures in all categories: 945