Description: On October 11, the ceiling was painted an historic crème color.
-
-
Description: Scott Groth and Kay Williams are painting the first of two coats.
-
-
Description: Fixtures were repaired and installed in early November by John Palof.
-
-
Description: At last… the tarps are swept and the painting supplies are collected.
-
-
Description: The scaffolding came down exactly opposite of how it was erected.
-
-
Description: It took ten volunteers three hours to remove the scaffolding November 16.
-
-
Description: Forty sheets of 4x8 plywood were removed and loaded onto two separate trailers.
-
-
Description: Six towers of scaffold that were three tiers high finally came down.